Client: Venture “Diviner”, Pont-Rouge, Portneuf
Project Manager: West Alvin
Project Started: Jan 1, 2008
Total SCADA Sensors: 1052
Active SCADA Sensors: 647
Manageable SCADA snsrs: 630
Networking:
- Switchboard Catalyst 3560 48 10/100/1000T + 4 SFP Enhanced Image
- Switchboard Catalyst 3750 48 10/100 + 4 SFP Standard Multilayer Image
- Routing and how to pass a drug test in 24 hours system code 129745
- Power supply Cisco 3825 AC power supply
- Switchboard Catalyst 3560 24 10/100/1000T + 4 SFP Standard Image
Servers:
- 490455-421 Proliant DL160R06 X5550 HP SATA/SAS HPM (Rack1U 2xXeonQC 2.66Ghz (8Mb)/6×2GbRD/P410wBBWC (256Mb/RAID5+0/5/1+0/1/0)/noLFF HDD (4)/noDVD/2xGigEth)
- 538274-421 Proliant DL165R06 2435 HPM Hot Plug SATA/SAS (Rack1U 2xOptSC 2.6Ghz (6Mb)/4×2Gb (6400)/P212wBBWC (256/RAID5+0/5/1+0/1/0)/noLFF HDD (2/4up)/noDVD/2xGigEth)
- 487795-421 Proliant ML370T06 E5520 (Tower XeonQC 2.26 GHz (8Mb)/2×2GbRD/P410i (256Mb/RAID5+0/5/1+0/1/0)/noHDD (8/24up) SFF)/DVD/iLO2std/4xGEth/3xFan/1xRPS460)
- 470065-083 Proliant DL380R06 E5520 (Rack2U XeonQC 2.26Ghz (8Mb)/3×2GbRD/P410i (256Mb/RAID5+0/5/1+0/1/0)/2×146Gb15kHDD (6)) LFF/noDVD/iLO2std/4xGigEth/1xRPS460)
- 487791-421 Proliant ML370T06 E5540 (Tower XeonQC 2.53 GHz (8Mb)/3×2GbRD/P410i (256Mb/RAID5+0/5/1+0/1/0)/noHDD (8/24up) SFF)/DVD/iLO2std/4xGEth/3xFan/1xRPS750)
- 490455-421 Proliant DL160R06 X5550 HP SATA/SAS HPM (Rack1U 2xXeonQC 2.66Ghz (8Mb)/6×2GbRD/P410wBBWC (256Mb/RAID5+0/5/1+0/1/0)/noLFF HDD (4)/noDVD/2xGigEth)
Power Systems:
- SUVTP20KH2B2S APC Smart-UPS VT 20KVA/16kW 400V w/2 Batt Mod Exp to 2, Int Maint Bypass, Parallel Capable, w/Start-Up Servise
- SBP120KHC1M1 Service Bypass Panel for 1×120 KW UPS
- SYH2K6RMI APC Symmetra RM 2KVA/1.4kW Expandable to 6KVA/4.2kW or N+3, Rack mount in: 1PH, out: (8) С13, (2) С19, Pre-Inst.
Web/SNMP, 8U - SUVTBXR6B6S APC Smart-UPS VT Extended Run Enclosure, w/MCCB, w/6 Batt. Modules
- AR3300 NetShelter SX 42U 600mm x 1200mm Enclosure
- AR2901 NetShelter VL 42U 600mm x 1070mm Deep Enclosure no Sides Black
Printing:
- Canon iR6880Ci, 68ppm, A3, a paper
Desktop Software:
- Acronis Backup and Recovery 10 Advanced Workstation incl. AAP el. Licence 1 – 9 Copies
- Royalty Win Svr Std 2008 32Bit/x64 Russian 1pk DSP OEI DVD 1-4CPU 5 Clt, the right of use
- Package of certification for program complex System Center Data Protection Manager 2007
System Software:
- MSRT2,5K Executive SCADA system on 2500 external points of input-output.
- MSRT-Psp Process equipment Certification
- MSRT2,5K-Net Network executive SCADA-system on 2500 external points of input-output
Data Protection:
- B1GDP9DPWF, Panda GateDefender Performa 9000 – the Device of protection of network Web-filter Module for GateDefender Performa 9500 (Large) (1 year), 213840
- B2CEPE, Panda Cloud Email Protection 101 – 250 licences (2 years), 1935,2256
- PGDIA, GateDefender Integra 100, 62370
- RB1GDICC? O, GateDefender Integra a full configuration (prolongation) 5 – 25 licences (1 year), 3046,1508