Client: Firm “Sled”, Macamic, Abitibi-Ouest
Project Manager: Fitzpatrick Randal
Project Started: Mar 12, 2010
Total SCADA Sensors: 355
Active SCADA Sensors: 312
Manageable SCADA snsrs: 313
Networking:
- Switchboard Catalyst 2960 48 10/100 Ports + 2 1000BT LAN Base Image, including a cord of food CAB-ACE
- Switchboard Catalyst 3750 24 10/100/1000T + 4 SFP Enhanced Multilayer
- Routing and detox drug test system code 373450
- Router – CISCO801 ISDN/Ethernet Router
- Switchboard Catalyst 3750 12 SFP Standard Multilayer Image
- Power supply Cisco 3825 AC power supply
- Module DSP on four channels a voice/fax
Servers:
- 594874-421 Proliant ML350T06 E5650 SFF HPM (Tower 2xXeon6C 2.66GHz (12Mb)/6×2GbRD/P410iwFBWC (1Gb/RAID5/5+0/1+0/1/0)/noHDD (8SFF/16up)/DVD/iLO2st/2xGigEth/2xRPS750)
- 470065-154 Proliant ML150T06 E5504 Hot plug SAS/SATA (Tower XeonQC 2.0Ghz (4Mb)/1×2GbUD/P410 (ZM/RAID1+0/1/0)/1×146Gb15kLFFHDD (4/8up)/DVDRW/GigEth)
- 470065-154 Proliant ML150T06 E5504 Hot plug SAS/SATA (Tower XeonQC 2.0Ghz (4Mb)/1×2GbUD/P410 (ZM/RAID1+0/1/0)/1×146Gb15kLFFHDD (4/8up)/DVDRW/GigEth)
- 504636-421 Proliant DL360R06 L5520 (Rack1U XeonQC 2.26Ghz (8Mb)/2×2GbUD/P410i (ZM/RAID1+0/1/0)/noHDD (4 (8upgr)) SFF/noDVD/iLO2std/2xGigEth/1xRPS460)
Power Systems:
- SYA8K8I APC Symmetra LX 8kVA/5.6kW Scalable to 8kVA/5.6kW, N+1 Tower, 220/230/240 or 380/400/415V, in: 1PH/3PH, out: 1PH, Pre-Inst.
Web/SNMP - SYBT9-B4 High Performance Battery Module for the Symmetra PX 160kW
- SYPM10K16H Symmetra PX Power Module, 10/16kW, 400V
- SURT8000XLI APC Smart-UPS RT, 8000VA/6400W, On-Line, Extended-run, 1:1 or 3:1, Black, Tower (Rack 6U convertible), Pre-Inst. Web/SNMP, with PC Business
Printing:
- Phaser 5500DT net.laz.printer – too (5500DN) + a feeder on 1000л.
Desktop Software:
- Package of certification for 1 operated server device Center Operations Manager 2007 Standard Server Management
- Full package for the certificated version of OS Windows Server 2008 Datacenter for use on 1 automated workplace
- Base package for the certificated version of personal computer Office 2007 ProPlus for use on 1 automated workplace
- Windows Vista Business SP1 32-bit Russian 1pk DSP OEI DVD, the adjusting complete set
- Full package for the certificated version of OS Windows Server 2008 Enterprise Edition for use on 1 automated workplace ***
System Software:
- MSRT-Oracle-SQL The Module of communication with SQL-server Oracle
- IMR-500 Industrial MasterReport (IMR) – cервер the press of the technological data on 500 external points of data gathering from OPC and SQL sources
- MSRT-BackUp Export of any archives Master SCADA to mdb-files.
- Inet-10 The Generator of reports with possibility of viewing of reports in Internet clients (Internet Explorer) – to 10 simultaneously connected clients.
- MSRT2,5K-Net Network executive SCADA-system on 2500 external points of input-output
- MSRT1K Executive SCADA system on 1000 external points of input-output.
Data Protection:
- RB2GDICC? T, GateDefender Integra a full configuration (prolongation)> 1001 licences (2 years), 2238,920838
- Total Protection Module (to 2500 users) (1 year), 965250
- B2PCIPDLPH, PANDA Cloud Internet Protection – Data Leakage Prevention Module 1001 – 3000 licences (2 years), 687,3768