Client: Firm “Justification – Consulting”, Warwick, Arthabaska
Project Manager: Christian Clarissa
Project Started: Mar 28, 2007
Total SCADA Sensors: 530
Active SCADA Sensors: 380
Manageable SCADA snsrs: 427
Networking:
- Router 2811 w/AC PWR, 2FE, 4HWICs, 2PVDMs, 1NME, 2AIMS, IP BASE, 64F/256D
- The switchboard 2960 on 24 ports Gigabit Ethernet Catalyst 2960 24 10/100/1000, 4 T/SFP LAN Base Image
- Routing and gift basket system code 366706
- The module 1-Port 2nd Gen Multiflex Trunk Voice/WAN Int.
Card – G.703 - Switchboard Catalyst 3560 48 10/100 PoE + 4 SFP Enhanced Image
Servers:
- 504056-421 Proliant ML330T06 E5506 LFF (Tower XeonQC 2.13GHz (4Mb)/2×2GbRD/P410i (ZM/RAID1+0/1/0)/noHDD (4LFF/8up)/DVD/iLO2std/2xGigEth)
- 487931-421 Proliant ML350R06 E5520 SFF (Rack5U XeonQC 2.26GHz (8Mb)/3×2GbRD/P410i (256Mb/RAID5+0/5/1+0/1/0)/noHDD (8SFF/16up)/DVD/iLO2std/2xGigEth/1xRPS750)
- 487362-421 Proliant DL580R05 X2.67 6-Core SAS (4xX7460-16mb/4×4Gb (16DIMM Slots)/no SFFHDD (8/16)/RAID (P400iwBBWC512Mb)/2xGigNIC/DVD, noFDD/4xHPRPS/iLo2Std)
- 487365-421 Proliant DL580R05 X2.13 4-Core SAS (2xE7430-12mb/4×1Gb (16DIMM Slots)/no SFFHDD (8/16)/RAID (P400i 256Mb)/2xGigNIC/DVD, noFDD/2xHPRPS/iLo2Std)
Power Systems:
- SYA16K16RMI APC Symmetra LX 16kVA Scalable to 16kVA N+1 Rack-mount, 220/230/240V or 380/400/415V, inp. 1PH/3PH, outp: 1PH, (8) C13, (10) C19, Pre-Inst. Web/SNMP
- NBRK0420 APC NetBotz 420 Rack Appliance with Camera
- SYH4K6RMI APC Symmetra RM 4KVA/2.8kW Expandable to 6KVA/4.2kW or N+2, Rack mount, in: 1PH, out: (8) С13, (2) С19, Pre-Inst. Web/SNMP, 8U
- SUVTXR2B6S APC Smart-UPS VT Extended Run Frame w/2 Batt. Modules Exp. to 6
- SUVTXR2B6S APC Smart-UPS VT Extended Run Frame w/2 Batt. Modules Exp. to 6
- SYPM2KU APC Symmetra RM 2KVA/1.4kW Power Module
Printing:
- Canon iR5065, 65ppm, A3, a paper
Desktop Software:
- The licence for use of the program of safe adjustment and the control certificated ON Windows Server 2003 Enterprise Edition (SrvE_Check)
- ExchgEntCAL 2010 RUS OLP NL UsrCAL woSrvcs, the right of use
- Base package for certificated ON Exchange Server 2007 Enterprise Edition for use on 1 automated workplace
System Software:
- OPC-server (HDA) for access to archives Master SCADA. External HDA-clients (SCADA and MES systems, databases) can download all archives of the project. Corresponds to version OPC HDA 1.1
- IMR-U Industrial MasterReport (IMR) – cервер the press of the technological data on unlimited quantity of external points of data gathering from OPC and SQL sources
- IMS-1K Industrial MasterServer (IMS) – a server of gathering of the technological data on 1000 arhiviruemyh parametres and 1000 external points of input-output.
- MSRT2,5K-Net Network executive SCADA-system on 2500 external points of input-output
- MSRT100 Executive SCADA system on 100 external points of input-output.
- Report-Inet-10 The Generator of reports with possibility of viewing of reports in Internet clients (Internet Explorer) – to 10 simultaneously connected clients.
Data Protection:
- B3UCOPCPC, Transition with Panda Cloud Email Protection on Panda Cloud Protection 26 – 50 licences (3 years), 2404,512
- B3UCOPCPE, Transition with Panda Cloud Email Protection on Panda Cloud Protection 101 – 250 licences (3 years), 2137,344
- B1MGDP9BDPAS, Transition with Panda GateDefender Performa 8050 Anti-spam Module: Transition with GateDefender Performa 8100 on GateDefender Performa 9500 Large (1 year), 294030
- RB2GDIAM? T, GateDefender Integra Anti-malware Module (prolongation)> 1001 licences (2 years), 599,71093875