Client: Branch office “Overwork”, Saint-Joseph-de-Beauce, Robert-Cliche
Project Manager: Flowers Antonia
Project Started: Mar 10, 2008
Total SCADA Sensors: 927
Active SCADA Sensors: 646
Manageable SCADA snsrs: 649
Networking:
- The module of vocal channels Dual-Port 60 Channel E1 Voice/Fax Network Module
- Module Four-port Voice Interface Card – FXO (Universal)
- iMG804A VDSL2 Gateway, 4 Ethernet LAN ports, Annex A, 50M/10M
- Switchboard Catalyst 2960 24 10/100 LAN Lite Image
Servers:
- 507784-B21 ProLiant BL460 G6 Xeon E5502 DC (Xeon 1.86GHz/4Mb/3×2GbRD/RAID P410i (ZM) 1,0/no SFF HDD (2)/2xFlex1/10Gb MF/iLO blade edit/1slot in Encl)
- 403626-B21 HP BladeSystem 16 port 4GB FC Pass-thru Module for c-Class BladeSystem (incl 16 SW SFPs with LC connectors)
- 507782-B21 ProLiant BL460 G6 Xeon E5520 QC (Xeon 2.26GHz/8Mb/3×2GbRD/RAID P410i (ZM) 1,0/no SFF HDD (2)/2xFlex1/10Gb MF/iLO blade edit/1slot in Encl)
- 491315-421 Proliant DL380R06 X5560 HPM (Rack2U 2xXeonQC 2.8Ghz (8Mb)/6×2GbRD/P410iwBBWC (512Mb/RAID5/5+0/1+0/1/0)/noHDD (8/16up) SFF/DVDRW/iLO2std/4xGigEth/2xRPS750)
- 491505-421 Proliant DL380R06 E5504 (Rack2U XeonQC 2.0Ghz (4Mb)/2×2GbRD/P410i (ZM/RAID1+0/1/0)/noHDD (8 (16up)) SFF/noDVD/iLO2std/4xGigEth/1xRPS460)
- 470065-233 Proliant DL360R06 E5504 (Rack1U XeonQC 2.0Ghz (4Mb)/2×2GbRD/P410i (256Mb/RAID5/5+0/1+0/1/0)/2×146Gb10k (4 (8up)) SFF/DVDRW/iLO2std/2xGigEth/1xRPS460)
Power Systems:
- SURT15KRMXLI APC Smart-UPS RT RM, 15kVA/12kW, On-Line, 1:1 or 3:1, Rack 12U, Extended-run, Pre-Installed Web/SNMP Card, with PC Business, Black
- ACF400 Rack Air Removal Unit 100-240V 50/60HZ for NetShelter SX 600 mm Enclosure
- SYA12K16I APC Symmetra LX 12kVA\8.4kW scalable to 16kVA\11.2kW, N+1, Tower, 220/230/240V or 380/400/415V, input: 1PH/3PH, output: 1PH, Pre-Inst.
Web/SNMP - SYBT9-B4 High Performance Battery Module for the Symmetra PX 160kW
Printing:
- Phaser 7400N sngl.net light-emitting diode (LED) the printer (f. А3, memory 256Mb, 36 цв/40ч-бел.коп./мин f. А4
Desktop Software:
- SQLSvrStd 2005 Win32 RUS DiskKit MVL CD/DVD
- Windows Vista Business SP1 64-bit Russian 1pk DSP OEI DVD, the adjusting complete set
- Package of certification for program complex Microsoft System Center Operations Manager 2007
System Software:
- IMR-U Industrial MasterReport (IMR) – cервер the press of the technological data on unlimited quantity of external points of data gathering from OPC and SQL sources
- MAS500 MasterSCADA Arcive Server (MAS) – the allocated archival SCADA-server on 500 arhiviruemyh parametres and 500 external points of input-output.
- PID – expert – 32 Station of engineering support SAR on 32 entered variables
- MSRT-MC-Email The Conclusion of messages to an E-mail
Data Protection:
- B3GDP9DPAM, Panda GateDefender Performa 9000 – the Device of protection of network Anti-malware Module for GateDefender Performa 9500 (Large) (3 years), 1069200
- B1PCIPANLH, PANDA Cloud Internet Protection – Analyze Module 1001 – 3000 licences (1 year), 382,0212
- B1PCIPADC, Panda Cloud Internet Protection (Advanced Bundle) 26 – 50 licences (1 year), 2583,9792
- B3UCOPCPG, Transition with Panda Cloud Email Protection on Panda Cloud Protection 501 – 1000 licences (3 years), 1870,176